Baluster spacing for a 12 ft stair railing

A 12 ft (144" level) stair railing on a 7-1/2" × 10" stair takes 27 wood balusters at 3-11/16" gaps or 32 metal at 3-5/8", under the 4-3/8" stair sphere. Along the 36.9° rail every mark is the level one × 1.250: wood balusters sit 6-1/2" apart on the rail.

Drawing the layout…
Quick-snap span between posts
in
in

post face to post face

in

under 4-3/8″

in
in
in

144" between posts (level)

27 balusters
3-11/16" gaps

Gap (level, square to balusters)
3-11/16"
3.696" · 94 mm
On centre along the rail
6-1/2"
5-3/16" level × 1.2500
End gaps
3-11/16" · 3-11/16"
Equal at both posts
Buy
30
27 + 10% waste
  • R312.1 4-3/8" sphereIRC R312.1.3
  • 6" stair triangleIRC R312.1.3
  • Posts ≤ 6'-0" apartAWC DCA 6 Fig. 30
  • Rail 34"–38"IRC R311.7.8.1

Hook the tape on the post face at the top of the bottom rail and mark down the slope. Marks along the rail are the level positions × 1.2500 (1 ÷ cos 36.9°).

0 / 27 marked
Running tape marks for this layout, from one hook of the tape
Done#MarkAlong railCentre (rail)Level
1Leading edge4-5/8"5-9/16"3-11/16"
2Leading edge11-1/8"12-1/16"8-7/8"+
3Leading edge17-5/8"18-9/16"14-1/16"+
4Leading edge24-1/8"−25-1/16"−19-5/16"−
5Leading edge30-5/8"−31-9/16"−24-1/2"−
6Leading edge37-1/8"−38-1/16"−29-11/16"
7Leading edge43-5/8"−44-9/16"−34-7/8"
8Leading edge50-1/16"+51"+40-1/16"
9Leading edge56-9/16"+57-1/2"+45-1/4"+
10Leading edge63-1/16"+64"+50-7/16"+
11Leading edge69-9/16"70-1/2"55-11/16"−
12Leading edge76-1/16"77"60-7/8"−
13Leading edge82-9/16"83-1/2"66-1/16"
14Leading edge89-1/16"90"71-1/4"
15Leading edge95-9/16"96-1/2"76-7/16"
16Leading edge102-1/16"103"81-5/8"+
17Leading edge108-9/16"109-1/2"86-13/16"+
18Leading edge115-1/16"−116"−92-1/16"−
19Leading edge121-9/16"−122-1/2"−97-1/4"−
20Leading edge128-1/16"−129"−102-7/16"
21Leading edge134-1/2"+135-7/16"+107-5/8"
22Leading edge141"+141-15/16"+112-13/16"
23Leading edge147-1/2"+148-7/16"+118"+
24Leading edge154"+154-15/16"+123-3/16"+
25Leading edge160-1/2"161-7/16"128-7/16"−
26Leading edge167"167-15/16"133-5/8"−
27Leading edge173-1/2"174-7/16"138-13/16"

Fillets: cut each one to the gap along the rail with the rake angle on both ends.

Wood or metal for 12 ft

1-1/2" wood or composite

Balusters
27 (buy 30)
Gap
3-11/16"
On centre
5-3/16" level · 6-1/2" on the rail
First edge from post
4-5/8"
Last edge from post
173-1/2"
Sphere
passes 4-3/8"

3/4" round or square metal

Balusters
32 (buy 36)
Gap
3-5/8"
On centre
4-3/8" level · 5-1/2" on the rail
First edge from post
4-9/16"
Last edge from post
174-1/2"
Sphere
passes 4-3/8"

4x4 posts at 147-1/2" on centre exceed the 6'-0" AWC DCA 6 guard-post limit: add a middle post or use a railing kit rated for this length.

12 ft railing layout 63 rows

Sort any column, print a shop sheet, download CSV. Click a row to load it in the calculator.

05 / Field guide

12 ft of rail,
27 balusters.

This sheet lays out a 12 ft (144") stair railing between post faces, measured level along a 7-1/2" × 10" stair. It compares 1-1/2" wood with 3/4" metal, gives every mark from one hook of the tape, and checks the 4-3/8" sphere rule and post spacing.

1-1/2" wood: 27 balusters

144" ÷ (1-1/2" + gap) fits 27 balusters with 28 equal gaps of 3-11/16" (3.696"), 5-3/16" on centre level and 6-1/2" along the rail.

From the post face the leading edges fall at 4-5/8", 11-1/8", 17-5/8", 24-1/8" and on in 6-1/2" steps. Buy 30 to allow 10% for splits and miscuts.

3/4" metal: 32 balusters

Thinner balusters need more of them: 32 at 3-5/8" gaps, 4-3/8" on centre (5-1/2" along the rail). The first four marks: 4-9/16", 10", 15-1/2", 21".

1" metal or composite takes 30 at 3-11/16"; 3-1/2" flat pickets take 20 at 3-1/2".

The 36.9° rake

On a 7-1/2" rise and 10" run the rail climbs 108" over this 144" run and measures 180" along its length. Clear gaps are measured level, square to the plumb balusters; every tape mark along the rail is the level distance ÷ cos 36.9° = × 1.2500.

Cut fillet strips to 4-5/8" for wood or 4-9/16" for metal, with 36.9° on both ends. Keep the bottom rail within 1-1/2" of the nosing line so the tread-riser triangle stays under a 6" sphere.

This span needs a middle post

With 4x4 posts the centres would be 12' 3-1/2" apart, past the 6'-0" DCA 6 limit for prescriptive guard posts. Add 1 intermediate post (2 bays of about 70-1/4" clear), or use a railing kit rated for this section length.

The rail sits 34" above the nosings (34" to 38" where it is also the handrail).

Questions

Answered plainly.

01How many balusters do I need for a 12 ft stair railing?+

27 of 1-1/2" wood or 32 of 3/4" metal for 144" between posts, centred with equal gaps. Buy about 10% more.

02How far apart are balusters on a 12 ft stair railing?+

3-11/16" clear between 1-1/2" balusters (5-3/16" on centre) or 3-5/8" between 3/4" balusters (4-3/8" on centre), measured level; along the sloped rail the centres are 6-1/2" and 5-1/2".

03Where does the first baluster go on a 12 ft railing?+

Its leading edge sits one gap from the post face: 4-5/8" for 1-1/2" wood or 4-9/16" for 3/4" metal, measured along the rail.

04Does a 12 ft railing need a middle post?+

Under AWC DCA 6, yes: guard posts may be at most 6'-0" apart, and 144" clear on 4x4 posts is 12' 3-1/2" on centre. Railing kits rated for longer sections are the exception.

05How many 1 inch balusters for a 12 ft railing?+

30 at 3-11/16" gaps; 3-1/2" flat pickets take 20 at 3-1/2".