stairstringerchart

Baluster spacing for a 7 ft deck railing

A 7 ft (84") deck railing between posts takes 16 wood balusters (1-1/2") at 3-1/2" gaps or 18 metal balusters (3/4") at 3-11/16", both under the IRC 4" sphere. Hook the tape on the post once: the first wood edge goes at 3-1/2", the next at 8-9/16", then every 5".

Drawing the layout…
Quick-snap span between posts
in
in

post face to post face

in

under 4″

in

84" between posts

16 balusters
3-1/2" gaps

Gap
3-1/2"+
3.529" · 90 mm
On centre
5"+
5.029" · 128 mm
End gaps
3-1/2" · 3-1/2"
Equal at both posts
Buy
18
16 + 10% waste
  • R312.1 4" sphereIRC R312.1.3
  • Deck-to-rail gap < 4"IRC R312.1.3
  • Posts ≤ 6'-0" apartAWC DCA 6 Fig. 30
  • Guard 36" minIRC R312.1.2

Hook the tape on the post face once and mark every baluster edge from there; each mark is rounded once, so a 1/16" never compounds down the rail.

0 / 16 marked
Running tape marks for this layout, from one hook of the tape
Done#MarkTapeCentreDecimal
1Leading edge3-1/2"+4-1/4"+3.529"
2Leading edge8-9/16"9-5/16"8.559"
3Leading edge13-9/16"+14-5/16"+13.588"
4Leading edge18-5/8"19-3/8"18.618"
5Leading edge23-5/8"+24-3/8"+23.647"
6Leading edge28-11/16"29-7/16"28.676"
7Leading edge33-11/16"+34-7/16"+33.706"
8Leading edge38-3/4"39-1/2"38.735"
9Leading edge43-3/4"44-1/2"43.765"
10Leading edge48-13/16"−49-9/16"−48.794"
11Leading edge53-13/16"54-9/16"53.824"
12Leading edge58-7/8"−59-5/8"−58.853"
13Leading edge63-7/8"64-5/8"63.882"
14Leading edge68-15/16"−69-11/16"−68.912"
15Leading edge73-15/16"74-11/16"73.941"
16Leading edge79"−79-3/4"−78.971"

Wood or metal for 7 ft

1-1/2" wood or composite

Balusters
16 (buy 18)
Gap
3-1/2"+
On centre
5"
First edge from post
3-1/2"
Last edge from post
79"
Sphere
passes 4"

3/4" round or square metal

Balusters
18 (buy 20)
Gap
3-11/16"+
On centre
4-7/16"
First edge from post
3-11/16"
Last edge from post
79-9/16"
Sphere
passes 4"

4x4 posts at 87-1/2" on centre exceed the 6'-0" AWC DCA 6 guard-post limit: add a middle post or use a railing kit rated for this length.

7 ft railing layout 38 rows

Sort any column, print a shop sheet, download CSV. Click a row to load it in the calculator.

05 / Field guide

7 ft of rail,
16 balusters.

This sheet lays out a 7 ft (84") deck railing between post faces. It compares 1-1/2" wood with 3/4" metal, gives every mark from one hook of the tape, and checks the 4" sphere rule and post spacing.

1-1/2" wood: 16 balusters

84" ÷ (1-1/2" + gap) fits 16 balusters with 17 equal gaps of 3-1/2"+ (3.529"), 5" on centre.

From the post face the leading edges fall at 3-1/2", 8-9/16", 13-9/16", 18-5/8" and on in 5" steps. Buy 18 to allow 10% for splits and miscuts.

3/4" metal: 18 balusters

Thinner balusters need more of them: 18 at 3-11/16"+ gaps, 4-7/16" on centre. The first four marks: 3-11/16", 8-3/16", 12-5/8", 17-1/16".

1" metal or composite takes 17 at 3-3/4"; 3-1/2" flat pickets take 12 at 3-1/4".

This span needs a middle post

With 4x4 posts the centres would be 7' 3-1/2" apart, past the 6'-0" DCA 6 limit for prescriptive guard posts. Add 1 intermediate post (2 bays of about 40-1/4" clear), or use a railing kit rated for this section length.

The guard top sits at least 36" above the deck and the bottom rail less than 4" above it.

Questions

Answered plainly.

01How many balusters do I need for a 7 ft deck railing?+

16 of 1-1/2" wood or 18 of 3/4" metal for 84" between posts, centred with equal gaps. Buy about 10% more.

02How far apart are balusters on a 7 ft deck railing?+

3-1/2" clear between 1-1/2" balusters (5" on centre) or 3-11/16" between 3/4" balusters (4-7/16" on centre).

03Where does the first baluster go on a 7 ft railing?+

Its leading edge sits one gap from the post face: 3-1/2" for 1-1/2" wood or 3-11/16" for 3/4" metal.

04Does a 7 ft railing need a middle post?+

Under AWC DCA 6, yes: guard posts may be at most 6'-0" apart, and 84" clear on 4x4 posts is 7' 3-1/2" on centre. Railing kits rated for longer sections are the exception.

05How many 1 inch balusters for a 7 ft railing?+

17 at 3-3/4" gaps; 3-1/2" flat pickets take 12 at 3-1/4".

Browse all 36 stair spec sheets and 14 railing layouts

Compare every height in one table →